pdf-to-gfx
A point-to-point I/O checkout .gfx for S1000 or any ECY family, with a formatted Excel checkout sheet included.
Distech EC-gfxProgram code, Niagara graphics and checkout sheets, built from your controls submittal in minutes. Choose Reviewed and a controls engineer signs off every file before you get it.
Why this exists
Placing the four-hundredth I/O point by hand is not what a senior technician is for. Checkout, commissioning and the customer are.
Integrators win jobs on people and service. Building and maintaining your own automation is a second business. We run it so you don't have to.
When a sequence leaves something out, we ask the engineer in writing and show the assumption next to the code it affects. Nothing is decided silently.
Speed is the easy part now. Being able to put your name on the file is the hard part, and that is the part we sell.
How it works
Your files and the options for the job. Sign in with an email link; no password.
Single tools quote on the spot from your files. Whole jobs: an engineer checks your counts against the documents, then the quote is emailed to you.
You accept the quote and pick Instant or Reviewed (same price). The build starts.
The file is generated and verified: every point bound, every unit and format stamped.
Reviewed: a controls engineer checks it first. Instant: it goes to you the moment it passes the automated checks, and is reviewed afterward.
Instant: minutes, with an email link you can open on site. Reviewed: released as soon as the engineer signs it off. Load it, check it out in the field, commission.
One click
What a full job looks like when the point list and the sequence go in together. Press the button to watch it run, sped up. Each stage shows how long it really takes to build, before the engineer reviews it. Every file is real and downloadable.
Download this sample set (.zip): the RFI, the .gfx, the .px with its background, the checkout sheet and the operator guide.
Traceability
Every function in the program points back to the sentence that asked for it. Nothing is added that the sequence didn't ask for, and nothing in it is dropped without a question to the engineer. This is the sample AHU-1: 29 control functions, 10 RFI questions, 43 hardware points.
supplyFanSpeedStatic PID with a high-limit PID; the lower output wins; minimum speed while running, 0 when off.
supplyFanSpeedCmdsupplyFanSpeedCmdductStaticHighLimitductStaticPressductStaticStptsupplyFanCmdsupplyFanMinSpeedDuct static high limit: "does not exceed 1.0 in. WC above scheduled total fan static / TAB value" - what absolute limit at PT-1 should be used?
Assumed: 2.0 in.wc at PT-1 (adjustable) until TAB sets it.
ductStaticResetEach interval: requests above the ignore count raise the setpoint (respond, capped); otherwise it trims down. Held at the initial value while the fan is off.
ductStaticStptductStaticStptductStaticInitStptductStaticMaxRespondPressductStaticMaxStptductStaticMinStptductStaticRespondPressDuct static trim & respond parameters (initial, minimum, trim, respond, max respond, interval) are not given.
Assumed: Initial 0.5, min 0.3, max 1.0 in.wc; trim 0.04, respond 0.06/request, max 0.15; 2 min interval; 2 ignored requests.
pdatResetTrim & respond on cooling requests (requests lower the setpoint, otherwise it trims up), then mode overrides.
Discharge Air sheet, as it opens in EC-gfxProgram. Tap to enlarge.
pdatResetStptpdatStptpdatResetStptpdatStptcoolDownDatStptcoolingRequestCountpdatMaxRespondAmtpdatMaxStptPDAT reset range and trim & respond amounts are not given.
Assumed: 55-65 F; trim +0.2 F, respond -0.3 F/request, max -1.0 F; starts at 65 F.
preheatValveFreeze protection (unit not running or tripped, OA < 35 F, or freezestat) holds PH-T at 70 F with a minimum position scheduled on OA-T. Heating closed in cool-down / night cool.
preheatValveCmdpreheatValveCmdfreezeStatTripAlarmoutdoorAirTemppreheatDischStptpreheatDischTemppreheatFreezeMinPos"Minimum position vs. OA-T" for the preheat valve is not defined.
Assumed: 0% at 35 F OA rising linearly to 30% at 0 F OA.
economizerDampersMA PID (economizer) and minimum OA airflow PID - higher wins; 100% with evap; closed in heat modes, when the fan is not proven or a safety has tripped. EA tracks OA, RA is the complement.
outdoorAirDamperCmdexhaustAirDamperCmdreturnAirDamperCmdoutdoorAirDamperCmdexhaustAirDamperCmdreturnAirDamperCmdactiveMinOaCfmeconDbevapPump1CmdMinimum OA airflow, CO2 maximum setpoint and the CO2-reset maximum airflow are not given.
Assumed: Min OA 4,000 CFM; RA-CO2 limit 1,000 ppm; CO2 reset up to 8,000 CFM.
evapStagingStage 1 on all permissives; stage 2 latched on EV-T error for the delay, off below setpoint - offset; min on/off per pump. LS-1 also breaks the pump starters in hardware.
evapPump1CmdevapPump2CmdevapPump1CmdevapPump2CmdcoolingCallcoolingDischStptdryOutActiveevapDischTempEvap "call for cooling" and the stage 2 off condition are not defined; minimum on/off times are not given.
Assumed: Call when MA-T > cooling setpoint + 2 F (off at setpoint); stage 2 off when EV-T < setpoint - 1 F; pumps 5 min on / 5 min off.
sumpFillDrainMV-1 opens for cold-weather drain, conductivity bleed or the weekly drain; SOV-1 fills only when warm with a cooling call and no drain; pumps wait 15 min after the sump is full.
sumpDrainValveCmdsumpBleedActivesumpFillValveCmdsumpReadysumpDrainValveCmdsumpBleedActivesumpFillValveCmdsumpReadycoolingCalldryOutActiveDry-out: confirm "ran >= 1 hr" may be one continuous hour, and what runs during dry-out (assumed fan on with OA at minimum, pumps off). Weekly drain day?
Assumed: One continuous hour of stage 1 in the last 24 h; fan on, pumps off, MV-1 open on the weekly drain day from the BAS schedule.
safetyShutdownsEach group is a Distech DelayedAlarm with no delay: latches on the trip; the BAS reset clears it only once the field device has cleared. Devices are also hardwired in the VFD safety chain.
smokeShutdownAlarmstaticSafetyAlarmfreezeStatTripAlarmsafetyShutdownsmokeShutdownAlarmstaticSafetyAlarmfreezeStatTripAlarmfireAlarmShutdownfreezeStatAlarmreturnLowStaticAlarmSmoke detector auxiliary contact action (opens or closes on alarm) is not stated.
Assumed: Closes on alarm (no reverse action on SA-SMK / RA-SMK).
See all 29 functions traced, with the full RFI and the files
Real output
Real output from the tools, run on a sample air handler. Download the files and open them in EC-gfxProgram, Workbench and Excel.
The math
Enter your job's size. See the programming and graphics hours by hand, what the same work costs here, and how much lower you can bid.
| By hand | Here | |
|---|---|---|
| I/O programming + checkout sheets | — | — |
| Graphics | — | — |
| Sequence programming | — | — |
| Hours | — | — |
| Cost | — | — |
Cost here uses the rates on the pricing page; with graphics and sequence programming both on, it is the whole-job price. Your hours here are the technician loading each program and checking it out, estimated at 15% of hand time. Nothing in this calculator is a quote; the quote comes from your actual files.
Why it matters
On a job with a few hundred controllers, programming and graphics are hundreds of hours of a senior technician's time, and every shop bids them at about the same rate. Take most of those hours out and you can bid lower than the shop that still does it by hand, keep the same margin, and win the job.
Field checkout and commissioning stay with your people. That work needs a person on site. Placing the four-hundredth I/O point does not.
A 300-controller building is about 1,650 hours of I/O programming and graphics by hand, before any sequence programming. At $100 an hour, that is $165,000 in the bid.
Based on 30 points per controller, 5 minutes per I/O point and 6 minutes per graphic point. Move the sliders to your own job.
The whole job
Send the controls submittal. Get back everything the job needs, built from the engineer's documents and reviewed by a controls engineer.
$260 per distinct sequence
$5.25 per hardware point
A sequence counts once however many units use it: 120 fan coils on one sequence is one sequence. Better documents raise the quality of what comes back; they never change the price. Full pricing
The pipeline
The tools are stages of one pipeline. Each stage's output is the next one's input, and each can be bought alone.
Single tools
Every part of the whole job is also sold on its own, quoted from your files.
A point-to-point I/O checkout .gfx for S1000 or any ECY family, with a formatted Excel checkout sheet included.
A Niagara .px operator graphic bound to the controller's points, in your color standard.
A formatted point-to-point checkout sheet from a .gfx you already have, without rebuilding it.
The control logic as drawn Logic sheets: PID loops, setpoints, interlocks, alarms. Your RFI for the engineer comes back first.
One .ntpl per equipment type, with points, histories, alarms and tags set up your way, plus setup instructions.